• About Us
    • Why FMI?
    • Mission Statement and Core Values
    • Executive Team
    • Testimonials
    • Community
    • Contact Us
  • Affiliates
    • Northern Civil Energy
    • Special Projects Division
  • Capabilities
    • Electrical Installation
    • High Voltage Cable Pulling
    • Civil Construction
    • Structural Steel & Tanks
    • Fabrication
    • Design Build
    • Airports
  • Projects
    • Green Field Projects
    • Brown Field Projects
    • 500 kV
    • 230 kV
    • 138 kV (up to)
    • Generation
    • HV Cable Pulling
    • Industrial & LNG
    • Structural Steel & Tanks
    • Awards
  • Careers
  • Electrical Installation
  • High Voltage Cable Pulling
  • Civil Construction
  • Structural Steel & Tanks
  • Fabrication
  • Design Build
  • Airports

Design Build

FMI project delivery emphasises the extensive capabilities for mechanical and electrical experience in the adoption of the Design Build requirements that have been mandated by our clients. Ever increasing client requirements have dictated that such capabilities have become a benefit to them and FMI as a contractor and proponent of the Design – Build is prepared to offer those attributes:

Single Point Responsibility – FMI has a long standing collaborative relationship with mechanical and electrical design firms and together we form a single cohesive team with proven track records of designing and construction of systems that meet or exceed the objectives of the project.

Reducing Cost – Early engagement on design means that the teams can develop solutions for cost management objectives. Team engagement in the early stages of design minimizes issues for long lead procurement, risk identification and resolutions for cost escalation.

Controlling Schedule – Constructability reviews and logistical planning maintain project schedules through efficient use of materials, labour, identification of transportation and logistical support and the identification of long lead items and vendor material supply.

Reducing Risk – Where applicable participation in the design process reduces risk by identifying and elimination of design errors, conflicts and omissions before construction, avoiding waste, delays and cost over runs.

Our Clients

Generation
Transmission
Distrubution
Renewable Energy
LNG
Industrial

Contact Information

Nanaimo, British Columbia
Head Office
1890 Schoolhouse Road V9X 1T4Tel: 250-753-1214Fax: 250-753-1210
Mission, British Columbia
Branch Office
#204-31510 Gill Avenue V4S 0A1Tel: 604-814-2863Fax: 877-402-2049
SPECIAL PROJECTS DIVISION,
OFFICE
1890 Schoolhouse Road, V9X 1T4Tel: 250-753-1214 ext 501Fax: 250-753-1210
Copyright © F&M Installations LTD. 2023. All Rights Reserved.