Tumbler Ridge Microwave Tower
Tumbler Ridge, BC
Tumbler Ridge Microwave Tower
$510,000
Project Overview
Tumbler Ridge Microwave Tower
Installation of foundation, antenna supporting structure, equipment and substation fence modification Work at Tumbler Substation near Tumbler Ridge, B.C. All or part of the Work was carried out in or adjacent to energized 25 kV / 230 kV substation and 25 kV / 230 kV transmission lines.
August 2012 to October 2012