Kokish Substation

Port McNeil, BC
Kokish Substation $3.7 Million

Project Overview

Civil, Electrical and P&C work on the new 138 kV switching station with three 138 kV circuit breakers, six 138 kV circuit breaker manual disconnect switches, three 138 kV line motorized disconnect switches and three 138 kV transmission line terminals.

Civil/Electrical work included:
• Placement and compaction of fill
• Forming and pouring concrete footings
• Installation of control building.
• Supply and install insulating gravel
• Installation of ground grid.
• Installation of support steel
• Installation of electrical components

Started June 2013

Compled January 2014